1. Any changes necessary at the time of installation will be billed in addition to the above total.
2. The entire cost (including labor, material, overhead, and transportation) for the installation of additional facilities to serve a QYL will be paid for by the member as outlined above. Any installed facilities are owned and maintained by SEC.
3. The route utilized has been designed by a staking technician with all underground utilities, both public and private, and any underground obstacles having been located prior to construction. Any obstacle that cannot be clearly marked must be exposed and marked by the member. A Miss Utility ticket will be obtained by the Cooperative to locate public utilities as required. The Cooperative will neo be held responsible for damages for improper marking or failure to locate obstacles.
4. The Cooperative will maintain the light at no charge during regular working hours. If vandalism is involved, all cost of repairs will be billed to the account listed above.